Wednesday, May 18, 2011

Follow up with Land Vendor

18 May 2011

  1. Follow up with land vendor En. Hailuddin, all the drawing still pending at Silk Highway. He will follow up with Silk, and arrange a meeting with us after obtain the drawing from Silk.
  2. Follow up with AIRIS Cik Hidayah regards the IWK status. We request IWK drawing from them, then will pass to Royal, Sam to follow up with IWK.
  3. Request Hidayah to send over the amount to paid for JPS.

No comments:

Post a Comment